Automation & controls
PLC, DCS, SCADA and HMI — designed, programmed and commissioned.
Controls, automation and commissioning for heavy industry. Twenty years. Seven countries. Zero lost-time incidents.
Chris Placentile, P.Eng, PMPFounder & principal engineer
→
Years in the field
Founded 2011Countries
4 continentsIndustries
All regulatedSafe on every site
Zero lost-time incidentsPLC, DCS, SCADA and HMI — designed, programmed and commissioned.
Factory and site acceptance testing, through to first power-on.
E-houses, switchgear and variable-speed drives.
PMP-led delivery from scope to closeout, across sites and trades.
Nuclear QA, 21 CFR Part 11, TSSA. Systems that pass.
I&C Engineering Manager · Controls & Commissioning Lead
I lead the teams that bring complex control systems to life — CANDU reactor tooling, Andean copper mines, Red Sea refineries — and I leave every site safe.
Delivered the full Unit 6 tooling series — removal, inspection, installation. Now leading controls for first-of-kind processes on the next units.
Software lead on the first-of-kind PT-CT combined removal tooling, cutting weeks from the critical path.
Led I&C commissioning of the automated tools that disassemble CANDU reactors. Every milestone hit.
Brought the site its first DeltaV system and rebuilt a critical nitrogen life-safety alarm.
Commissioned the first Siemens gearless drive in the Americas and an 8 km overland conveyor. 100% safe throughout.
Validation-driven automation projects, leading teams of up to 40.
Ran the ~$9M controls programme for Metro Vancouver's Seymour-Capilano UV plant.